Residential Subdivision

South Street - Seven residential terraced dwellings , Auckland

Project Goal - Seven residential terraced dwellings

Project Parameters - Extensive 1 % AEP flood volumes accommodated in overland flowpath design utilising ROW area. 

Services provided 

  • Concept Scheme and Drainage Plans

  • Pre-request and attend pre-application meetings

  • Prepare Scheme Plan 

  • Public Civil Drainage Design

  • Stormwater Detention Tank Report 

  • Catchment Flood Risk Assessment Report

  • Prepare and submit Resource Consent 

  • Construction Control Installation 

  • Grid definition 

  • Set Out Pre-Pour on Profiles

  • Survey Certification

  • As Built of all works and CCTV 

  • Land Transfer Survey 

  • Compilation of 224 and completion Data 

  • Project administration 


Project Period: 2017 - ongoing
​Project Budget: ​$6 million

Torino Street - Four residential terraced dwellings , Point England Auckland

Project Goal - Four residential terraced dwellings 

Project Parameters - New four lot development with new architecturally designed dwellings. Full right of way design with the innovative use of vehicle turning carousels due to limited site width. 

Services Provided 

  • Concept Scheme and Drainage Plans

  • Pre-request and attend pre-application meetings 

  • Prepare Scheme Plan 

  • Public Civil Drainage Design 

  • Prepare and submit Resource Consent 

  • As Built of all works and CCTV 

  • Land Transfer Survey 

  • Compilation of 224 and completion Data 

  • Project administration 


Project Period: 2017 - ongoing
​Project Budget: $6 million

Canberra Ave, Lynfield Auckland

Project Goal - 2 Stage project with a total eight separate dwellings

Services Provided 

  • Topographical Survey 

  • CCTV of Wastewater and Stormwater lines

  • Stormwater Detention Tank Report 

  • Public Civil Drainage Design 

  • Civil Right of Way Design 

  • Prepare Scheme Plan

  • Compilation of 224 and completion Data

  • Project administration


Project Period: 2016 - ongoing 
Project Budget: $8 million

Whisper Cove - 36 high quality unit titles
Snells Beach, Auckland

Project Goal - Whisper Cove: 36 Integrated Unit Title Dwellings

Location - Snells Beach 

Project Parameters - The Whisper Cove development required specialist services to develop an integrated residential development with associated facilities on the property.

Services Provided

  • Boundary adjustment and subdivision to create five separate large lot titles for later staged development sites 

  • Define an extension to and realignment of Arabella Lane as legal road and create an esplanade reserve to vest in Council 

  • Resource Consent application for subdivision and obtain Section 223 Certification and LINZ approval as to survey for Unit Title 

  • Obtaining approvals under Sections 221, 223, and 224 of the Resource Management Act 

  • Creation of fee simple and unit titles around an approved development, with a incorporated society for common areas 

  • Engineering survey set out, level control and monitored construction of dwellings. 


Project Period: 2006 to 2007
Project Budget: Stage 1, $50 million

Links Road - 16 residential duplex townhouse dwellings , New Lynn Auckland

Project Goal - 16 residential duplex townhouse dwellings 

Project Parameters - The construction of 16 new houses on fee simple lots along a new private road 'Korowha Place'. All public works have been designed, monitored, and certified by BSCL civil engineers.  

Services Provided 

  • Construction Control Installation 

  • Grid definition 

  • Set Out Pre-Pour on Profiles

  • Survey Certification

  • Concept Scheme and Drainage Plans

  • Prepare Scheme Plan 

  • Public Civil Drainage Design 

  • Prepare and submit Resource Consent 

  • As Built of all works and CCTV 

  • Land Transfer Survey 

  • Compilation of 224 and completion Data 

  • Project administration 


Project Period: 2015 - ongoing  
​Project Budget: ​$16 million

Swanson - Five separate dwellings,Henderson
Auckland

Project Goal - Five separate dwellings 

Services Provided ​

  • Concept Scheme and Drainage Plans

  • Pre-request and attend pre-application meetings 

  • Topographical Survey

  • Stormwater Detention Tank Report

  • Public Civil Drainage Design 

  • Civil Right of Way Design 

  • Prepare Scheme Plan 

  • Land Transfer Survey

  • Compilation of 224 and completion Data

  • Project administration 


Project Period: 2017 - ongoing 
​Project Budget: $5 million

Clarkhouse - Hobsonville, Auckland

Project Goal -  Subdivide heritage building from 1.94 hectares of land. 

Project Parameters - An existing heritage building to remain on the site and the balance of around 1.94 hectares to be subdivided and developed. 

Services Provided 

  • Concept Scheme and Drainage plans 

  • Pre-request and attend pre-application meeting 

  • Topographical Survey 

  • Drainage Design, Building Consent, Prepare and Lodgement

  • Stormwater Detention Tank Report 

  • Catchment Flood Risk Assessment Report

  • Investigate and Consulate Historic Locations

  • Prepare Scheme Plan 

  • Prepare and submit Resource Consent 

  • Land Transfer Survey

  • Compilation of 224 and Completion Data

  • Project administration 


Project Period: 2016 - ongoing 
Project Budget: $20 million+

McLeod Road Unit Title Development - Te Atatu South, Auckland 

Project Goal – The proposal is to undertake a seven stage unit title development with a total of 53 terraced dwellings. 
 
Project Parameters – St Clair Park - Niu Garden will be a gorgeous micro community of mews-style homes set well off McLeod Road. It is only minutes away from an array of useful local amenities, shops, and bus stops. There will be 53 terrace houses in total. The 'First Stage' will include 13 properties, with options of 2 bedrooms or 4 bedrooms.

Services Provided

  • Prepare Subdivision Resource Consent Application

  • Prepare Land Transfer Unit Title Plan

  • Site survey to fix location of first stage buildings

  • Completion of Cadastral Dataset for proposed unit plan and lodgement with LINZ for approval

Project Period: 2016 - 2019
Project Budget: $40 million