Construction Building

One Queen Street
​Auckland CBD
One Queen Street

Project Goal - Will be apart of the exciting development of Precinct Properties, Commercial Bay Project. 

Project Parameters - In completion the development will be a 20 story building will combine with a 11 level hotel containing 244 guest rooms and suites with meeting suites, a health club, club lounge facilities and a restaurant. 


Project Budget - $1.0 Billion

Completion date - 2020 to 2022

Commercial Bay,
​AUCKLAND CITY
Commercial Bay

Project Goal - Commercial Bay is a 39 level tower encompassing commercial space, retail, public space, hospitality, and public transport. 

“Auckland CBD's highly ambitious and challenging Commercial Bay development is now well advanced.
The $1 billion undertaking is 10 projects in one.
It includes doing up two existing buildings, building five new retail precincts, some underground rail tunnels and one monster office tower”
 - Source ONE NEWS 14.05.19

Project Parameters - Commercial Bay is a striking 39 level tower on the former site of the Downtown mall at the foot of Queen Street. The tower's foundations will be dug concurrently with the beginning of the tunnels for Auckland City Rail Link, which will link Britomart and the city centre with the existing western line near Mt Eden.

Services Provided

  • Calculation of grid in relation to boundary

  • Calculation of building in relation to grid

  • Establishment and maintenance of survey control and setting out of grids

  • Structural dilapidation survey by drones of surrounding buildings

  • Monitoring of surrounding buildings

  • Setout of structural fixings

  • Setout CRL tunnel under building site 

  • As Built completed tunnel for future land transfer work

  • As Built plans of grid set-out on concrete slab

  • Issue of Surveyors Certificates for height and position


Project Budget: $900 million 
Completion Date: 2019

Wynyard 100, Auckland CBD
Wynyard 100

Project Goal - A six building commercial, retail, and tourism scheme.

Project Parameters - The development will include a 120 room hotel, a tourism entertaining venue, a 380 car park building, office, retail, and residential activities. 

Services Provided 

  • Construction Control Installation and Boundary Pegging 

  • Grid/Pile definition 

  • Pile Set Out

  • Grid Set Out to Columns 

  • Level 0-7 Grid Set Out Pre Pour and Post Pour

  • Grid Set Out to Slab Edge of Level 1 

  • Set Out Curved Ramp 

  • Set Out and As Built Lift Pits and Stairs 

  • Survey Certification 


Project Period: 2018-2030
Project Budget: $212 million

University of Auckland, School of Business Building
​GRAFTON, AUCKLAND
University of Auckland Business School

Project Goal - New building for the Auckland University School of Business Management
 
Client - Fletcher Construction 
Sub Contractors - Dominion Constructors, Graysons Steel Fabricators, and Marin Construction
 
Location - Central City, Auckland 

Project Parameters - This project was the University’s largest project. It provided 20,000m2 floor space in eight floors together with a five level basement car park. 

Services Provided Involvement 

  • Calculation of grid in relation to boundary 

  • Calculation of building in relation to grid 

  • Establishment and maintenance of survey control and setting out of grids 

  • As Built plans of wing walls and lift pits

  • Setting out of steel columns, checking verticality of columns to tolerance 3mm 

  • Monitoring movement of soldier piles under de-stressing and monitoring of movement of columns before and after concrete pour 

  • As Built plans of grid setout on concrete slab 

  • Issue of Surveyor Certificates for height and position


Project Period: 2004 to 2007 
Project Budget: $250 million

New Zealand International Convention Centre and
Hobson Street Hotel, Auckland CBD
NZICC

Project Goal ​– The New Zealand International Convention Centre will be 32,000 sqm of convention centre and a 5 star, 300 room  luxury Hobson Street Hotel.
 
Project Parameters – NZICC and the Hobson Street Hotel will be constructed together. It will be a world class facility complete with a retail laneway linking Nelson and Hobson Streets and 1327 car parks. The NZICC will be capable of hosting conventions of around 3000 to 4000 people depending on the events.

Services Provided

  • Calculation of grid in relation to boundary 

  • Calculation of building in relation to grid 

  • Establishment and maintenance of survey control and setting out of grids 

  • 3D Scanning and Monitoring of surrounding buildings

  • Setout of piles, foundation pads and crane bases

  • Retaining wall pile monitoring

  • As Built plans of grid setout on concrete slab 

  • As Built plans of pit shutters

  • Issue of Surveyor Certificates for height and position

 
Project Budget: $700 million
Completion Date: 2019

Fonterra Building,
​AUCKLAND CITY
Fonterra

Project Goal – The Fonterra Building is a seven story, 16,000m2 building for the Fonterra Head Office, including an additional basement level carpark.

Project Parameters – Located opposite Victoria Park the building design responds to Fonterra's environmentally conscious and sustainable approach to business, with environmental initiatives such as:

  • Greywater harvesting,

  • A highly engineered building façade to optimise natural light and occupant comfort and minimise energy use,

  • External 'green walls' spanning the full height of the building, and

  • Energy efficient lighting and air conditioning


Services Provided

  • Calculation of grid in relation to boundary 

  • Calculation of building in relation to grid 

  • Establishment and maintenance of survey control and setting out of grids 

  • Monitoring of surrounding buildings.

  • Retaining wall pile monitoring

  • As Built plans of grid setout on concrete slab 

  • Issue of Surveyor Certificates for height and position


Project Budget: $100 million 

Auckland City Mission,
AUCKLAND CBD
Auckland City Mission

Project Goal - The Auckland City Mission building with Built Environs. The proposal is to undertake the redevelopment and extension of the Mission HomeGround. 

Project Parameters - The Auckland City Mission is going to undertake a redevelopment that will include 80 secure and  affordable housing apartments for those with limited incomes. The redevelopment will also provide an extension of existing social services, including health care, dentistry, and a new alcohol and drug detoxification services, providing 30 beds. 

Services Provided  

  • ​Construction Control Installation

  • Existing Boundary Marking 

  • Grid/Pile definition

  • Pile Set out and As Built 

  • Lower and Upper First Floor Grid Setout pre pour 

  • Tower Grid Setout Level Basement to Level 9

  • Survey Certification


Project Period: 2018 - 2020
Project Budget: $100 million

Mount Eden Prison, Auckland
Mt Eden Prison

Project goal - Construction of new accommodation block (Building C)

​Project parameters - Accommodate for an additional 245 inmates, create programme rooms, AVL facilities, staff facilities, multi-use rooms, a satellite health facility, and visiting rooms.  
 
Services Provided  ​​

  • Construction Control Installation and Boundary Pegging 

  • Grid/Pile definition 

  • Pile Set Out

  • Grid Set Out to Columns 

  •  Grid Set Out Pre Pour and Post Pour

  • Grid Set Out to Slab Edge

  • Set Out Curved Ramp 

  • Set Out and As Built Lift Pits and Stairs 

  • Survey Certification 


Project Period:  2016 - 2018 
Project Budget: $100 million