Apartments
30 Madden Street
Auckland CBD
Project Goal - Luxury way of living and entertaining as an addition to Wynyard Quarter
Project Parameters - Upon completion the complex will consist of a 140 unit apartment block with three living options. These are apartments, townhouses and penthouses.
Project Period - Stage 1: 2018 to 2020
Project Budget - 220 Million
FABRIC
Spring Street, Onehunga
Project Goal – FABRIC of Onehunga is a new pocket neighbourhood where considered apartment living meets shared green spaces, situated between Victoria Street and Spring Street in one of Auckland’s oldest urban villages.
Project Parameters – Stage 1 of the project consists of a community of 161 apartments in three buildings over four levels with a common backyard and communal secured basement level car parking for the residents, which spans beneath all three buildings
Services Provided
-
Construction Control Installation
-
Grid Definition
-
Setout bulk earthworks, anchor piles and foundations
-
Grid Set Out Pre Pour
-
Set out complex bolt layout for steel structure
-
Precast Panel As Builts
-
Survey Certification
Project Period: 2018 - ongoing
The James Apartment, Newmarket Auckland
Project Goal - The James is a five level luxurious 29 Apartment Development with basement car parking and retail stores below.
Location - Newmarket, Auckland
Project Parameters - The James is a boutique development of 29 residences, designed mindfully to incorporate form, function, and style.
Services Provided
-
Calculation of grid in relation to boundary
-
Calculation of building in relation to grid
-
Establishment and maintenance of survey control and setting out of grids
-
As Built plans of grid setout on concrete slab
-
Issue of Surveyor Certificates for height and position
Project Period: 2016 - 2017
Project Budget: $10.6 million
Dominion Road , Auckland
Project Goal - Multi level hotel 40 apartments with retail ground level
Project Parameters - The construction of a new boutique hotel in Mount Eden which includes 60 suites, cafe, retail and function spaces, and 15 car parks. Full Subdivision Consent process along with advising the client and completing the Unit Title Surveying.
Services Provided
-
Prepare and submit Resource Consent
-
Land Transfer Survey
-
Compilation of 224 and completion Data
-
Project administration
Project Period: 2016 - ongoing
Project Budget: $20 million
Metlife retirement
Gulf Rise, Red Beach
Project Goal - Gulf Rise is a modern and purpose built Metlifecare retirement village, located in Red Beach, Hibiscus Coast.
Project Parameters - The Gulf Rise, Metlifecare retirement village, upon completion will provide a large variety of different living options, made up of 305 units, to cater for new residents.
Services Provided
-
Construction Control Installation
-
Grid Definition
-
Grid Set Out Pre Pour
-
Set out complex bolt layout for steel structure
-
Precast Panel As Builts
-
Survey Certification
Project Period: 2018 - ongoing
Project Budget: Exceed $200 million
Sugartree Apartments
Nelson Street, Auckland City
Project Goal - Sugartree Stages 1 to 3 – 13 Level Apartment Building (total 675).
Location - Auckland CBD
Project Parameters - Stage 1 and 2 of 3 is a 13 Level Apartment Building in Auckland CBD, completed in January 2017. We are currently working on Stage 3.
Stage 1 includes two levels of basement car parking, 15 retail shops, and 148 apartment units over 10 levels. This is a mixture of Studio, 1, 2, and 3 Bedroom Units. Stage 2 includes 240 apartments and Stage 3 includes 287 apartments. The common courtyard incorporates two water features with landscaped and paved areas.
Services Provided
-
Calculation of grid in relation to boundary
-
Calculation of building in relation to grid
-
Establishment and maintenance of survey control and setting out of grids
-
Monitoring movement neighbouring buildings
-
As Built plans of grid setout on concrete slab
-
Issue of Surveyor Certificates for height and position
Project Period: 2015 - 2019
Project Budget: $250 million
Summerset at Heritage Park-Ellerslie, Auckland
Project Goal - The Summerset Heritage Park is a modern and purpose built retirement village located in Ellerslie.
Project Parameters - The Summerset Heritage Park retirement village upon completion will provide a large variety of different living options for 450 new residents.
Services Provided
-
Construction Control Installation
-
Grid Definition
-
Grid Set Out Pre Pour
-
Set out extensive large scale amenity features such as a lake, bowling greens, and connecting bridges
-
Level 0,1,2,3,4 Grid Set Out
-
Precast Panel As Builts
-
Survey Certification
Project Period: 2018 - ongoing
Project Budget: $250 million