top of page

RESIDENTIAL DEVELOPMENT

Kesteven Avenue, Glendowie

Project Parameters

The construction of six new dwellings with Freehold titles. Barry Satchell have been involved since the project commencing with all of the surveying, planning and engineering project requirements handled by Barry Satchell.


Services Provided

  • Topographic Survey

  • Preparation of Scheme Plan

  • Public Civil Drainage Design

  • Public Right of Way Design

  • Traffic Assessment

  • Planning consultation and advice

  • Planning AEE and RC Application

  • Engineeering Approval

  • Project administration

Project Period

2025-ongoing

Project Budget

$5 million

bottom of page